CHARLESTON COUNTY SCHOOL DISTRICT EMERGENCY OPERATIONS CENTER

A new Emergency Operation Center of approximately 4,500 SF to allow the school district to move their data center, school security operations and emergency operations into one location. This building is adjacent to existing CCSD facilities and includes a connecting enclosed connector to the main Bridgeview Building.
The connector was constructed to allow safe fire egress from the existing building. The new facility utilizes load bearing CMU, brick veneer, combination structural steel joists/metal truss roof framing, some interior walls of CMU, modified bituminous roofing membrane, metal stud & drywall interior partitions, FRP doors
according to District Standards, heavy duty impact resistant glass and extensive electronics in the Data and Conference Rooms. It is an Essential Category Facility.

Show More

Copyright © 2020 Rosenblum Coe Architects, Inc.

All images contained on this web site are protected by United States copyright law and may not be reproduced, distributed, transmitted, displayed, published or broadcast without the prior written permission of Rosenblum Coe Architects, Inc.