HOME        FIRM       PROJECTS       RECOGNITION       CONTACT

MUSC Walton 8th Floor Renovation

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

     

 

 

 

 

 

 

 


This renovation project consists of a complete interior demolition and alteration of the existing labs and storage spaces. The pathology department of MUSC was in need of multiple high-end office spaces in which meetings and conferences could be held. A variety of materials are being used throughout the design to achieve a sophisticated look. Custom designed wood casework and Corian countertops line the perimeter of the entire space. All offices contain custom designed furniture and are enclosed in glass walls, which helps bring natural light into the center of the space. Curved wooden panels are suspended from the exposed ceilings and accent lighting help accentuate the details. “Glass art panels" are hung by a cable system that is connected to the structure above. The design consists of an open floor plan with easy circulation routes, sound absorbing materials, and an overall comfortable work environment. The project was completed in August of 2006 for a construction cost of $1.6 million.

 

Rosenblum Coe Architects, Inc.   

rca@rosenblumcoe.com                121 Wentworth St. Charleston, SC 29401              843.577.6073